The photovoltaic plant is located in Bargas, Spain. The hilly landscape of Bargas is subjected to hot summers, with temperatures rising up to 40°C. The Developer and EPC of the project called for a solution that would provide a high DC/AC ratio, an optimized system for transport and installation, as well as an easy O&M, to lower the LCOE.
Sungrow’s 7.2 MW turnkey solution with 1,500 Vdc technology provided the perfect solution for this intricate project. The 7.2 MW turnkey solution consisted of two SG3125HV-20 central inverters, a medium voltage transformer, medium voltage cells and other supporting components.